1
2003
Purchase and moving from Pennsylvania to Houston. Eleven photos plus text.
2
1/20/04
Making the dolly to move the mill 5 miles by trailer into a residential garage.
3
2/4/04
Continuing the dolly manufacture.
4
2/04
First trial lift of the mill. Seven photos and text.
5
2/24/04
First jack used in the mill mover. It would not work. Four photos and text.
6
2/26/04
New hydraulic system. It worked.
7
3/10/04
Setting up the mover to actually move the mill.
8
3/10/04
The mill on the mover being tilted into position for the move.
9
3/10/04
Continuing to tilt the mill into position on the mover.
10
3/12/04
Fully tilted into position and ready to move. One photo.
11
3/15/04
Loading the mill mover onto a trailer and finally into the final shop.
12
3/23/04
Changes to the BOSS 9. Photos of the mill head and Bridgeport video monitor.
13
3/31/04
Spindle repair. Removing broken bolts from the spindle nose.
14
4/04
Beginning of retrofit. Electronics have been removed from the mill.
15
5/16/04
Beginning of Centroid installation.
16
5/21/04
Continuing installation. Pictures of pulleys.
17
5/27/04
Controls have been added. Almost finished.
18
6/7/04
Servos installed. Controller up and running. Inverter added.
19
6/24/04
First job on the completed mill.
20
6/27/04
Building the table enclosure.
21
1/2/05
Modifications to table enclosure. Trico MD-1200 added. Tool holder added.
22
2/3/06 Moved controller keyboard to a swivel table mounted on the mill base.
23
2/3/06 Collet tray made of 1" 6061 aluminum
24
1/23/08
New chip cage and new keyboard
25
4/23/08 Relocated control head